
Things are moving along nicely. The main loft is almost finished, as is the stairwell. The front gates have had their coat of undercoat ready for the proper paint and the papering is still to be done. The front gates were in need of some attention so it was lucky for us that the workman took a whole load of paint off them when they jetwashed the drive at the end of the build - newly painted gates at no cost to us.
No comments:
Post a Comment